LUO Tao DONG Lan LI Bo WANG Xiaolong MEN Linlin. Application of TDA5005 industrial total station at BEPCⅡ[J]. Nuclear techniques, 2010, 33(9): 663-666.
LUO Tao DONG Lan LI Bo WANG Xiaolong MEN Linlin. Application of TDA5005 industrial total station at BEPCⅡ[J]. Nuclear techniques, 2010, 33(9): 663-666.DOI:
For reconstruction of the Beijing Electron Positron Collider(BEPCⅡ)
performance of the industrial total station Leica TDA 5005 was combined with technical requirements of BEPCⅡ.The control points and instruments reference points of the storage ring were measured repeatedly.In this paper
we analyze the accuracy and reliability of automatic target recognition(ATR) measurement with TDA5005
and discuss the feasibility of applying it in the accelerator alignment measurement.The results can be of help in this kind of applications in alignment measurements of similar accelerators.