MA Yuanrui ZHU Yizhou WANG Chihu XIE Yongcheng. Research and project practice in AP1000 nuclear plant MCR assemblies seismic test[J]. Nuclear techniques, 2013, 36(4): 040611
MA Yuanrui ZHU Yizhou WANG Chihu XIE Yongcheng. Research and project practice in AP1000 nuclear plant MCR assemblies seismic test[J]. Nuclear techniques, 2013, 36(4): 040611 DOI: 10.11889/j.0253-3219.2013.hjs.36.040611.
Background: The seismic test is one of Plant Equipment Seismic Qualification Methodologies.Purpose: To satisfy the special requirements of AP1000 seismic qualification
this test is not same to traditional seismic test.Methods: AP1000 nuclear plant equipment qualification has new methods and requirements.The special requirements as response spectrum
accelerometer installation and functional test are described for AP1000 MCR seismic test.Results: The test results are demonstrated that MCR assemblies are satisfied as AP1000 seismic qualification requirements.Conclusions: These requirements are beneficial to the qualification for structural integrity and functional safety.They are also used to find design margin.